LEED Zertification Atterseehaus
Ziele des Projekts
The project aims to achieve LEED (Leadership in Energy and Environmental Design) Gold certified status under the LEED EBOM: Exisitng Buildngs Operations and Maintenance system.
Projektkennzahl
Full refurbishment of an existing office building Certified gross floor area: 13.700 m² Year of construction: 2001 Project duration: May 2014 -J une2016 First Platin (highest level) certified office building under the LEED EBOM system in Austria
Projektinhalt
CES made a pre-assessment of the property in order to define the best strategy to achieve a LEED Gold certified building. The pre-assessment phase included a detailed analyses of the sustainability criteria as defined by LEED system; including the inspection of HVAC systems, energy and water consumption data etc.Subsequent to the pre-assessment phase, CES is developing and working on the whole certification process, proposing and implementing necessary measures in order to achieve a LEED Gold certification. As the hotel, that is also located in the building, is undergoing a complete renovation, special attention has was given to combine the required hotel standards with specific green building standards.
Projektbesonderheiten
The project is aiming for certification under the Existing buildings-OM system, which means that special attention needs to be given to value engineering and optimization of operation processes in the building, like cleaning and waste management. CES team has successfully defined optimized strategy to fulfil the necessary green building standards.
Leistungen
CES is providing complete certification services. This includes engineering services for implementing necessary technical improvements in the building, especially for HVAC systems. The complete certification process, including application to the GBCI is covered by CES.
Standort
Vienna, Austria
Dauer
2015 - 2017