Trans Austria Gasleitung GmbH (TAG GmbH) replaces the underground insulation of the pipelines and fittings as part of the general refurbishment of the valve stations. The insulation of the TAG 1 line, associated slide groups and blow-out piping contain asbestos fibers. The removal and disposal of the insulation is carried out according to a refurbishment concept specially adapted to the authorities and is supervised by our asbestos-specific supervisor.
Ludmannsdorf, Austria – Site Supervision – Asbestos Removal at TAG 1 Substation Re-Adaptation
OUr services
The commissioned remediation company implements the specific remediation concept and is supervised by the construction site supervision in all remediation steps. After completion of the work, the remediation results are checked by air measurements by the supervisor. Moreover, the construction site supervisor provides comprehensive documentation and quality proofing.