Weitendorf, Lanzenkirchen & Eggendorf, Austria – Major Overhaul Valve Stations (MOVS 2020): ACM-Related Site Supervision at TAG Valve Stations

  • CES HOME
  • 5
  • PROJECTS
  • 5
  • Weitendorf, Lanzenkirchen & Eggendorf, Austria – Major Overhaul Valve Stations (MOVS 2020): ACM-Related Site Supervision at TAG Valve Stations

Trans Austria Gasleitung GmbH (TAG GmbH) replaces the underground insulation of the pipelines and fittings as part of the general refurbishment of the valve stations. The insulation of the TAG 1 line, associated slide groups and blow-out piping contain asbestos fibers. The removal and disposal of the insulation is carried out according to a refurbishment concept specially adapted to the authorities and is supervised by our asbestos-specific supervisor.

OUr services

The commissioned remediation company implements the specific remediation concept and is supervised by the construction site supervision in all remediation steps. After completion of the work, the remediation results are checked by air measurements by the supervisor. Moreover, the construction site supervisor provides comprehensive documentation and quality proofing.

Location:

Central Europe,
Austria

Duration:

2020-08 -
2021-05