Netz NÖ GmbH and the EVN Group were considering dismantling the power plants located at Peisching and all associated structures, including underground collectors, intake structures and tanks.
For this purpose, the experts of CES were to prepare an overview of the necessary steps and, based on the planning and construction costs available to the EVN Group or, in part, to be reassessed, as well as revenues from metal and construction material recycling, are to determine the total expenditure for the client in the form of a rough cost estimate.