The principal objective of the assignment was to develop the basic concept into a detailed project design and to estimate its capital and operating costs. It was expected that the Project will lead to at least 30 per cent of energy savings. The assignment included the preparation of a detailed inventory of selected public buildings, an estimation of the energy consumption and identification of the energy savings potential including the required investment. The principal objective of the assignment was to develop the basic concept into a detailed project design and to estimate its capital and operating costs. It was expected that the Project will lead to at least 30 per cent of energy savings.
Pinsk, Belarus – Energy Efficiency Refurbishment of Public Buildings in the City
OUr services
Preparation of a detailed inventory of selected public buildings; Estimation of current energy consumption and performance of the identified building stock; Energy and cost analyses; Identification of energy savings potential; Preliminary and approximate estimation of the investment required for all scenarios; Development of Measurement and Verification (M&V) approach; Development of financial models for the selected buildings using the main financial project parameters for 3 potential scenarios; Procurement strategy.