Zeltweg, Austria – Steam Power Plant: ACM Related Site Supervision of Demolition Works

  • CES HOME
  • 5
  • PROJECTS
  • 5
  • Zeltweg, Austria – Steam Power Plant: ACM Related Site Supervision of Demolition Works

Professional and standardized implementation and documentation of the complete dismantling, treatment, and disposal of asbestos-containing components and stock prior to demolition of the Zeltweg power plant. A consortium of MCI and Boehm & Lange conducted demolition works of the abandoned steam power plant at Zeltweg (Styria, Mur Valley). Components consisting of weakly bound asbestos (ACM) were in insulation, flanges and dividers throughout the entire plant facilities. The asbestos removal took place at different levels of the boiler house and was accompanied and monitored by CES.

OUr services

The ACM related site supervision comprised mainly inspections and measurements before, during and after the removal of asbestos in the course of demolition, like; Weekly air samplings monitoring asbestos fiber content at demolition and remediation zones; Final measurement at the end of the remediation works; Technical monitoring of asbestos removal, consisting of visual inspections of the demolition and remediation of the area before and after asbestos removal; Interpretation of test results and confirmation of the remediation success.

Location:

Central Europe,
Austria

Duration:

2012-12 -
2013-03