Georgia – Construction of Gudauri 8.0 MW Hydro Power Plant

On behalf of a private investor, CES was awarded a contract for planning the run-of-river Gudauri hydropower plant in northern Georgia and for registration as a CDM project.

Gudauri hydro power scheme was located on the River Tetri Aragvi and was planned in two stages. The first development stage comprised the hydropower plant with two Pelton turbine units of 4 MW each. In the final development, the hydropower scheme had a total output of 9.2 MW.

OUr services

CES assisted the client with registration at UNFCCC as a CDM project. The engineering contract covered the various planning stages from preliminary design and configuration of facilities, determination of costs, approval design up to detailed engineering and design of the hydropower plant structures. In addition to planning, the Consultants drew up the specifications and tender documents.

Location:

Eastern Europe,
Georgia

Duration:

2010-10 -
2011-03