The report of the partial stock survey included the following: An overview of the inspected places; A compilation of significant asbestos products with sample pictures; A list of particularly critical areas of high priority for action; Naming the remediation method for each asbestos product or occurrence. In combination, an annex to the report containing the tabular listing of all parameters and a plan representation of all localities was compiled.The company Wien Energie GmbH strived to optimize the internal processes of environmental and worker protection and to become aware of any potential hazards at their sites in order to derive further measures. Starting from the initial survey of dismantled and the remaining asbestos-containing components in the operations building and workshops building in February 2015, the ACM experts of CES worked out a specific asbestos cadastre for selected buildings and areas of the power plant site by visual inspection and sampling. The content of this work was the qualitative stocktaking and labelling of asbestos-containing materials.
News & Publications