Municipal Hospital Rudolfstiftung, Pathological Department, Air Sampling after Asbestos Removal Works.
Quality Monitoring of Asbestos Removal Works according to Austrian Standard ÖNORM M 9406.On the Eastern facade on level 0 and -1 of the Hospital's main building, window sills and the facade itself were cleaned from sprayed asbestos and sedimented asbestos fibers by a...
District Cooling for Hospital Mödling and EVN Corporate Headquarter: Process Design
As one part is a joint district heating and cooling system heat can be sold during summer time. The district colling pipe enables the operator to decide, which process shall deliver the cooling power.EVN installed two cooling facilities, which then were connected by a...
DONAUTURM Panorama Tower Vienna – Regular status assessment of known asbestos deposits
Status evaluation of the remaining asbestos deposits in relevant public areas of the Tower and determination of remediation urgency according to Austrian Standards.The Consultant was supporting the DONAUTURM companies since the first partial remediation of asbestos...
Don Bosco Haus, Vienna: Sustainable Refurbishment Concept
Achieving energy potential savings, optimization of the costs of the life-cycle, and preparation of a sustainable reclamation concept.For the Don Bosco Haus in 1130 Vienna, St. Veit-Gasse 25, a renovation concept was developed in correspondence with the content...
Biomass prefeasibility studies for 15 DH companies in Serbia
The project aimed at facilitating the development of a market for biomass and supporting the sustainable use of biomass in the generation of heat and electricity in Serbia. In terms of capital investments, the Serbian government and KfW envisaged the construction of...
Implementation of Sustainable Energy Finance Facilities in Ukraine (USEFF) – Project Consultant
The objective was to instigate a self-sustaining market for investment in sustainable energy projects in Ukrainian private sector companies. In order to achieve this objective, the Consultant worked closely with local Banks and selected local engineers to ensure that...
Former Dormitory, Ploesslgasse 2, 1040 Vienna: Construction Site Waste Scheme and Pollutant Survey
The aim was to conduct a qualitative and quantitative determination of waste streams in the course of demolition of the building and underground constructions and installations. The construction site waste scheme was implemented according to Vienna waste management...
Boehringer Ingelheim RCV – Bio 1 (G016) and Bio 2 (G050): Renewal of the the existing chillers for air conditioning
Renewal of the existing chillers for air conditioning for Bio 1 and 2.In buildings G016 (Bio 1) and G050 (Bio 2), the existing chillers for air conditioning were replaced with new, more powerful units. In particular, problems associated with the hydraulic have been...
Solvay Bulgaria: Full Survey and Risk Evaluation of Asbestos Containing Materials
Verification of existing ACM deposits by visual inspections, to setup a multi-variable deposit database, to advise on appropriate remediation technology, related cost estimate, as well as technical and economical prioritization of disposal actions.The Soda industries...
Biology Campus University of Vienna, Asbestos and Mineral Fiber Deposits: Survey and Specialized Site Supervision
In course of implementing a safety and fire protection system in the Biology Campus Building of the University of Vienna (UZA 1 Biozentrum), maximum protection for users, persons and the environment was achieved. Since the work was performed during ongoing operations,...